My Clients and my work history: Extensive International Construction Management experience gained at various projects in the field of fabrication, on-site fabrication, heavy lift, erection and commissioning. Personally developed or managed development of numerous methodology statements and approaches in the area of mechanical construction, fabrication and erection. Extensive site experience and track record of working successfully in different parts of the world. At present: April 2013 to present – Erection Site manager Baku Ship Yard – Azarbeijan One Goliath crane 300T x 80m, two Jib Cranes 25T x 40m September 2012 to Jan 2013 Province Andra Pradesh, India Past Clients: Consultant at Central Termoelectrica RIO TURBIO, 2 x 120 MW, 2 ACCs, in Santa Cruz province, Argentina, South America Severn Power Station, near Newport -Wales: Construction supervision ACC Air – Cooled – Steam Condenser for 824 MW gas-fired turbines, United Kingdom KONECRANES Heavy Lifting Corporation, Finland www.conecranes.com June 2008 to March 2009 Leighton Contracting (Qatar) W.L.L. May 2007 to June 2007 Senior Inspector, at Bakrie Construction Co., Sumuranja, Merak, West Java, INDONESIA. Fabrication of 5.200 Ton of steel structures for Port Hedland Marine Works Contract – AUSTRALIA,www.leightonasia.com Montavar MetalnaNova Co. July 2004 to April 2006 Port Koper- Konecrane Container Crane Erection www.luka-kp.si Erection manager; Crane structure was fabricated mainly in MONTAVAR MetalnaNova Co. in Maribor-Slovenia and delivered to Port Koper, and Erection manager – of Cement process plant Anhovo web: www.salonit.si. Impol-Inotechna Co. Slovenia Start Date: April 2002 to July 2004 Position/Title: Erection department manager/ Project manager Responsibilities/Achievements: Project QA QC management, coordination with Clients, Contractors and Sub Contractors in all fields- Fabrication and Erection of Furnaces and equipment for Aluminium and other process Plants. Site Erection manager of Aluminium Mills (3pcs) at IMPOL d.d. Co.,Equipment supply by ACHENBACH Germany. www.achenbach.de Position/Title: Project manager, Superintendent, Responsibilities/Achievements: Site production QA- QC management, coordination with Client, Contractors and Sub Contractors in all fields of Fabrication and Erection of Gantry Cranes…. (apx.2000 metric tons of equipment fabricated localy in Kuala Lumpur,… Malaysia). Up to Year 2000 Year 2000 Jan to Dec.: Maribor, Vrhovo,- Slovenia Position: Site Survey Works, Technology, Erection superintendent. Equipment: Paper Mill industry, Hydro-mechanical Equipment Renovations,.. Work on Project Site: 9 months Project name: ICRMT-Illinois Central Rail Marine Terminal USA Location: USA-Louisiana-(working for Connex Austria/Metalna ECCE Co. Austria) Position: Site survey works, technology, Erection in Koper-Slovenia Supervisor, Roll off and Finalization at ICRMT Dock superintendent. Work on Project Site: in Slovenia port of Koper 4 months, at ICRMT’s dock Luissiana-USA, with interruptions 10 months Location: (USA-Alabama-working for ConnexAustia /Metalna ECCE) Equipment: Gantry type ship Unloader (1500T/h) Position: Site survey works, technology, Erection in Koper-Slovenia Supervisor, Roll off and Finalization in Port of Mobile superintendent / Manager. Work on Project Site: in Slovenia port of Koper 5 months, at port of Mobile – 8 months, Project name: Container Cranes Kunz-Krems (Austria), Location: Metalna Co.-Slovenia Equipment: Crane steel structure factory fabrication Position: factory fabrication technical project manager Work on Project: at home office 8 months, at site 1 week,.. Project name: Willi Becker program of ship rudder blades and trunks (Germany), Location: Metalna Co.-Slovenia Equipment: Ship Rudder Blades and Trunks (largest 3 pcs., each 100 Tons) Position: At Factory- Fabrication Technical Project Manager Work on Project: at home office 10 months Project name: HEP Bhumibol Location: Thailand-(working for Metalna & Metalna Corporation New York), Equipment: Penstock fabrication in Bangkok, site pre-assembly at Bhumibol project.. Position: Site survey works, technology, project manager, site sub-contract superintendent and manager. Work on Project Site: 6 months, at home office 2 months Project name: Hydro Elec. Plant Pak Mun – Thailand Location: Thailand-(working for Metalna & Metalna Corporation New York), Equipment: Spillway gates (8 sets), Turbine Intake and Outlet hydro-mechanical equipment, Position:Preparation of tender, erection technology, site survey, Site Erection Manager. Location: (Canada), Equipment: Penstock and Bifurcation in Metalna Co.– Slovenia and Site erection supervisor Position: Site survey works, technology, project manager, site sub-contract superintendent and manager. Work on Project Site: 5 months, at home office 2 months Project name: HEP Mahabad Iran, Location: (Iran), Equipment: Gates and Penstock- technology preparation for Metalna Co. Position: Site survey works, technology, renovation study. Location: (Slovenia), Equipment: Hydro power plant Projects Position: Metalna Co. Site survey works, technology, project manager, site superintendent Work on Project Site: at home office and site total: 16 months Project name: Derbendi Khan Project, Location: (Iraq), Equipment: Renewal of Turbine intake, caterpillar gates and Spillway radial gates, Site inspection and Installation Project Manager Position: Metalna Co.-Site survey works and technology Work on Project Site: 2 months, home office 1 year Project name: Chiew Larn Project Thailand, Location: (Maribor-Thailand), Equipment: Pre-assembly of Penstock dia. 11.2m (36.7 ft diameter) x 400m (1312 ft length), 3 pcs. bifurcation, gates & hydro-mechanical equipment, Position: Metalna Co.-Site survey works and technology Work on Project Site: at home office 10 months Project name: Navigation Lock No.1, Iraq, Location: (Maribor-Iraq), Equipment: Mitre, Rolling lock gates, Sub-mergible radial gates, Site superintendent Position: Metalna Co.-Site survey works and technology Work on Project Site: 1 month, at home office 6 months Project name: HEP Blanda, Location: (Iceland), Equipment: Gates and Penstock dia. 4/3.4m (13/11 ft) x 560m (1830 ft length) with bifurcation- installation technology preparation Position: Site survey works, technology, project manager, site superintendent Work on Project Site: at home office 10 months Project name: HEP Aswan II, Location: (Egypt), Equipment: Gates installation technology preparation Position: Erection method preparation at Metalna office Work on Project: 13 months at home office Project name: HEP Haditha, Iraq, Location: (Iraq), Equipment: Pre-assembly of Penstock dia. 11.3m (437 ft diameter) x 97m (318 ft length) x 2 sections, hydro mechanical equipment.. Metalna Co.-Storage area, Pre-assembly penstock and transportation Manager. Work on Project Site: 13 months Project name: Uranium Mine & Plant Zirovski Vrh, Slovenia Location: (R. of Slovenia), Equipment: Processing equipment installation Position: Erection Site assistant and later Site manager for Metalna Co. Work on Project Site: 1 year 6 months Location: R. of Croatia Equipment: Penstock, gates, site fabrication and installation Position: Works at Erection Site Work on Project Site: 2 months |